Fittings
Step Uno
Phase 1 is fundamental: some specialized operators (naval mechanic and hydraulic) are responsible for the precise hydraulic implant and mechanic links installment and assembly to the engine room. Then, with the woodwork staff, they proceed with the compartmentalization phase, the peak of extraordinary art of woodcraft, thanks to the professional GA.DI. Allestimenti. Next step includes finishing touches and painting, a very important passage since boats and yachts are constantly plunged in water. This is perhaps the most long-lasting phase, since it is necessary to assure the boats are not damaged by climate factors.
